Starting September 27, 2021 City of Milbank workers together with HK Solutions Group will begin sewer main cleaning.
Focused area of work will be on the west end of town.
River Street to South 2nd Street and 3rd Avenue to 7th Avenue
Residents should place a towel over the toilet and close the lid over it. This should be done when the truck is seen in your area. After the truck has finished run water in all sinks, showers, and tubs. Dump a couple gallons of water down all floor drains.
Questions or Problems: Call Mr. Poppen directly at 605-880-0774